Case Studies

Learn how Rockwater has helped our clients

Production Chemicals

Scaling Problems Solved

July 18, 2012

Scale problems were causing exorbitant stripping costs and interrupting production. After a 2-day process, Rockwater returned the well to production with gas production up 160% and oil production up 336%.

Gas Plus Pays Out In Half A Day

July 18, 2012

Rockwater provided the analysis, service and products that made this gas well in the Permian Basin pay out in less than 12 hours. The well continues to pump at levels exceeding previous levels. Rockwater products used: GasPlus gas production enhancer and AF-5020 multifunctional foamer.